Resources
Resources
BIM Standards
The standards and schemas we deliver against, explained without the acronym soup.
- ISO 19650-1Concepts and principles
- Defines the vocabulary and the information management lifecycle — appointing parties, delivery teams, information containers and the common data environment.
- ISO 19650-2Delivery phase of assets
- The process standard for the capital delivery phase: exchange information requirements, execution plans, responsibility matrices and delivery planning.
- ISO 19650-3Operational phase
- Extends the same principles into operations, covering how asset information is maintained and updated once the building is in use.
- LOD / LOINLevel of information need
- How much detail an element carries at a given stage. LOD describes geometry; LOIN is the broader requirement covering geometry, data and documentation together.
- IFCIndustry Foundation Classes
- The open exchange schema. Used for handover, cross-platform coordination, and any case where a client should not be locked to one vendor's file format.
- COBieConstruction Operations Building information exchange
- A structured spreadsheet format for asset handover data. A transport format rather than a specification — the fields still have to match the client's FM system.
Need this on your project?
Send us the scope and the stage. You will get a considered reply from a BIM engineer.