Fewer surprises on site, and a programme you can defend.
Main contractors carry the risk when coordination fails. We front-load that risk into the model, where fixing it costs a fraction of what it costs once the trades are on site.
What usually goes wrong
- MEP subcontractors modelling to their own conventions, producing a federated model nobody trusts
- Clash reports so large the team stops reading them
- Programme changes that cannot be assessed for buildability until it is too late
- RFIs reaching site that should have been resolved at design stage
How we help
Enforceable subcontractor standards
Naming, ownership and delivery dates written into the BEP and audited, so every trade model arrives usable.
Triaged clash resolution
A managed matrix with owners and due dates, driven to closure in coordination meetings you can actually run.
4D buildability review
Sequence, access and crane reach checked against the model before the programme is committed.
Site-ready outputs
Coordinated drawings, setting-out data and installation sequences produced straight from the federated model.
Services that apply
BIM Coordination
Federated models released on a fixed cycle, with architectural, structural and MEP disciplines held to one shared standard.
Clash Detection
A managed clash matrix, not a raw report. Every conflict triaged by severity, assigned an owner and tracked to documented closure.
4D Planning
The construction programme linked directly to model geometry, so a schedule change becomes a visual sequence the same day it happens.