Skip to main content
FBESGROUP
All solutions

Solution

Contractors

Fewer surprises on site, and a programme you can defend.

Main contractors carry the risk when coordination fails. We front-load that risk into the model, where fixing it costs a fraction of what it costs once the trades are on site.

What usually goes wrong

  • MEP subcontractors modelling to their own conventions, producing a federated model nobody trusts
  • Clash reports so large the team stops reading them
  • Programme changes that cannot be assessed for buildability until it is too late
  • RFIs reaching site that should have been resolved at design stage

How we help

  • Enforceable subcontractor standards

    Naming, ownership and delivery dates written into the BEP and audited, so every trade model arrives usable.

  • Triaged clash resolution

    A managed matrix with owners and due dates, driven to closure in coordination meetings you can actually run.

  • 4D buildability review

    Sequence, access and crane reach checked against the model before the programme is committed.

  • Site-ready outputs

    Coordinated drawings, setting-out data and installation sequences produced straight from the federated model.

Services that apply

  • BIM Coordination

    Federated models released on a fixed cycle, with architectural, structural and MEP disciplines held to one shared standard.

  • Clash Detection

    A managed clash matrix, not a raw report. Every conflict triaged by severity, assigned an owner and tracked to documented closure.

  • 4D Planning

    The construction programme linked directly to model geometry, so a schedule change becomes a visual sequence the same day it happens.

Let's talk about your project

Send the scope and the stage, and we will tell you honestly what would help most.