Skip to main content
FBESGROUP
All services

Service

Digital Twin Solutions

The model should still be useful on the day the building opens.

Overview

Most projects hand over a model that is technically complete and operationally useless — no asset data, no verified as-built geometry, and nothing that maps onto the maintenance system the client already runs.

We plan the asset information model from the start, populate it as construction progresses, verify it against what was actually installed, and hand over data the facilities team can import on day one.

Typical outcomes

Assets with structured data
100%
Faster FM mobilisation
30%
Useful asset record life
25 yrs

What's included

  • Asset information planning

    Required asset data defined at the start, against the client's maintenance system rather than a generic template.

  • COBie data drops

    Structured data delivered at each agreed milestone, validated rather than assembled in a rush at handover.

  • Scan-to-BIM verification

    Point cloud survey registered against the model to confirm as-built geometry within a stated tolerance.

  • Operational model handover

    A lightweight, navigable model handed to facilities management with the asset data linked and searchable.

What you receive

  • Asset Information Model (AIM)
  • Validated COBie data drops
  • Verified as-built model and deviation report
  • Point cloud registration and survey data
  • FM handover pack and training

Need this on your project?

Send us the scope and the stage. You will get a considered reply from a BIM engineer.