The model should still be useful on the day the building opens.
Overview
Most projects hand over a model that is technically complete and operationally useless — no asset data, no verified as-built geometry, and nothing that maps onto the maintenance system the client already runs.
We plan the asset information model from the start, populate it as construction progresses, verify it against what was actually installed, and hand over data the facilities team can import on day one.
Typical outcomes
- Assets with structured data
- 100%
- Faster FM mobilisation
- 30%
- Useful asset record life
- 25 yrs
What's included
Asset information planning
Required asset data defined at the start, against the client's maintenance system rather than a generic template.
COBie data drops
Structured data delivered at each agreed milestone, validated rather than assembled in a rush at handover.
Scan-to-BIM verification
Point cloud survey registered against the model to confirm as-built geometry within a stated tolerance.
Operational model handover
A lightweight, navigable model handed to facilities management with the asset data linked and searchable.
What you receive
- Asset Information Model (AIM)
- Validated COBie data drops
- Verified as-built model and deviation report
- Point cloud registration and survey data
- FM handover pack and training