Projects described as they actually ran — including the parts that were not working at the start.
- Commercial
42-storey commercial tower: from 9,000 clashes to a stable register
Three MEP subcontractors, three sets of conventions, and a federated model nobody trusted. Rebuilt around an enforceable standard.
5 min read - Infrastructure
Coastal interchange: three utility conflicts designed out before construction
A live corridor with incomplete utility records, and alignment models that only met the structures after design freeze.
4 min read - Industrial
Logistics hub: maintenance access resolved in the model, not on site
Conveyor and racking equipment from four vendors, coordinated against building services in a 900mm ceiling void.
4 min read