Service
Clash Detection
Ten thousand clashes is not a report. It is a way of avoiding a decision.
Overview
Anyone can press run and export nine thousand clashes. That number is useless: most of it is noise, none of it is owned, and the team learns to ignore the report entirely.
We build a rule-based clash matrix per discipline pair, tune the tolerances until the results are real, triage what remains by severity, and drive each item to a documented closure with an audit trail behind it.
Typical outcomes
- Clashes closed before site
- 92%
- To a stable clash count
- 9 wks
- Cheaper than fixing on site
- 20x
What's included
Rule-based clash matrix
Test sets defined per discipline pair with appropriate tolerances, so the output is signal rather than volume.
Severity triage
Every clash classified by construction impact, so the team resolves what matters first instead of working alphabetically.
Ownership and tracking
Each issue assigned to a named person with a due date, tracked in the CDE until it is closed and verified.
Closure verification
Resolved clashes re-tested on the next federation to confirm the fix held and did not create a new conflict.
What you receive
- Configured clash matrix and test sets
- Triaged issue register with owners and dates
- Clash burn-down reporting
- Resolution audit trail
- Site-ready coordination drawings
Need this on your project?
Send us the scope and the stage. You will get a considered reply from a BIM engineer.