Linear assets, live corridors, and utilities nobody has recorded properly.

Infrastructure projects break the assumptions most BIM workflows are built on: linear geometry, multiple authoring platforms, and existing conditions that are rarely documented accurately.

What usually goes wrong

  • Alignment models in Civil 3D and structures in Revit, only compared after design freeze
  • Incomplete or unreliable records of existing buried utilities
  • Coordination across a corridor rather than within a building footprint
  • Staged possessions that make sequencing errors extremely expensive

How we help

  • Cross-platform coordination

    Shared coordinates and a federation process that spans Civil 3D, Revit and vendor models.

  • Existing utility capture

    Survey and modelling of existing conditions before detailed design, not after the first strike.

  • Corridor-wide clash management

    A clash matrix scoped to linear assets, with chainage-based reporting the site team can use.

  • Possession sequencing

    4D simulation of staged works and possessions, so the sequence is proven before it is priced.

Services that apply

  • BIM Coordination

    Federated models released on a fixed cycle, with architectural, structural and MEP disciplines held to one shared standard.

  • Clash Detection

    A managed clash matrix, not a raw report. Every conflict triaged by severity, assigned an owner and tracked to documented closure.

  • 4D Planning

    The construction programme linked directly to model geometry, so a schedule change becomes a visual sequence the same day it happens.