Linear assets, live corridors, and utilities nobody has recorded properly.
Infrastructure projects break the assumptions most BIM workflows are built on: linear geometry, multiple authoring platforms, and existing conditions that are rarely documented accurately.
What usually goes wrong
- Alignment models in Civil 3D and structures in Revit, only compared after design freeze
- Incomplete or unreliable records of existing buried utilities
- Coordination across a corridor rather than within a building footprint
- Staged possessions that make sequencing errors extremely expensive
How we help
Cross-platform coordination
Shared coordinates and a federation process that spans Civil 3D, Revit and vendor models.
Existing utility capture
Survey and modelling of existing conditions before detailed design, not after the first strike.
Corridor-wide clash management
A clash matrix scoped to linear assets, with chainage-based reporting the site team can use.
Possession sequencing
4D simulation of staged works and possessions, so the sequence is proven before it is priced.
Services that apply
BIM Coordination
Federated models released on a fixed cycle, with architectural, structural and MEP disciplines held to one shared standard.
Clash Detection
A managed clash matrix, not a raw report. Every conflict triaged by severity, assigned an owner and tracked to documented closure.
4D Planning
The construction programme linked directly to model geometry, so a schedule change becomes a visual sequence the same day it happens.